Freeze the Configuration
Record cabinet series, software hash, peripherals, bill validator, TITO or cashless interface, voltage, and network state.
Separate laboratory checks, commissioning results, floor observations, and commercial forecasts so unlike evidence is never presented as one number.
Record cabinet series, software hash, peripherals, bill validator, TITO or cashless interface, voltage, and network state.
State room temperature, supply voltage, connectivity, test account, sample duration, and any simulated faults.
Verify boot, payment acceptance, interrupted transactions, audit meters, peripheral recovery, alerts, and rollback.
Attach timestamps, observed values, exceptions, corrective actions, retest outcome, operator witness, and final disposition.
| Metric | Required definition | Do not infer |
|---|---|---|
| Coin-in | Accepted wager value over a declared period and cabinet population | Profit or cash collected |
| Theoretical hold | Configured mathematical expectation for an approved game version | Guaranteed actual hold |
| Actual hold | Observed result over a stated sample and reconciliation method | Long-run performance from a short sample |
| Occupancy | Active play time divided by available time, with downtime rules stated | Demand outside the measured window |
| MTTR | Clock start, clock stop, exclusions, technician tier, and parts availability defined | Every location receives the same response |
Provides pricing control and transaction visibility. It also introduces server availability, cybersecurity, data-governance, recurring-fee, and network-recovery dependencies.
Can continue through some network failures and reduce software dependency. It adds physical collection, validator service, reconciliation effort, and weaker portfolio analytics.
Shortens triage when telemetry is available and permissions are current. It cannot correct a damaged harness, failed power supply, obstructed fan, or restricted regulatory component.
Supports physical inspection and component replacement. Travel time, site access, technician authorization, and depot stock affect restoration time.